Sewer Installation

Residential Subdivision of 10 lots in water charged ground, sewer comprised of 420m of 225mm to a depth of 5.8m, trench boxes were used for safety of our workers, along with trench benching, ground water spears and diesel pumps we used to remove the water out of the ground for four continuous weeks.

Location: Taren Point

2016