hello@domain.com

+00 999 123 456

Sewer Main

Sewer Main extension completed on a cliff face, cliff was cut to make a track for the excavator, trench broken out by hydraulic hammer, rocksaw, pipe laid and concrete encased.

Location: Westleigh

2016

IMG_5672

Sewer Main extension completed on a cliff face, cliff was cut to make a track for the excavator, trench broken out by hydraulic hammer, rocksaw, pipe laid and concrete encased.

Comments are closed.