hello@domain.com

+00 999 123 456

Water Main Upgrade

Night works were carried out to replace the existing water main with 450mm P.E. water main. We worked alongside with archaeologist on a sensitive site.

Location: Lennox Bridge

2015

Night works were carried out to replace the existing water main with 450mm P.E. water main.  We worked alongside with archaeologist on a sensitive site.

Comments are closed.